Public Works

Bid Results

The following projects have recently bid through the Capital Project Bidding Process. All projects listed below are the apparent low bidder and will remain apparent until the project is awarded. If you have any questions about the projects listed below or the bidding process, please call the Engineering Division at 707.428.7485.

Peabody Road Water and Sewer Line Relocation Project

Bid Date: April 9, 2013
The apparent low bidder is Mountain Cascade Inc from Livermore.
Their bid amount was $2,234,750.00
#2 - J&M, Inc. - $2,292,804.25
#3 - Ghilotti Construction Co. - $2,322,532.00

Parcel 6/Nelson Road Corner Earth Move Project

Bid Date: March 26, 2013
The apparent low bidder is Lister Construction from Vacaville.
Their bid amount was $148,420.00
#2 - Nichelini General Engineering - $189,995.95
#3 - Independent Construction Co. - $212,767.41

Claybank Road Pavement Rehabilitation and SSWA Tolenas Lateral Replacement Project

Bid Date: November 15, 2012
The apparent low bidder is McGuire and Hester from Oakland.
Their bid amount was $2,028,227.50
#2 - Argonaut Constructors - $2,212,210.50
#3 - Suulutaaq, Inc. - $2,316,255.00

North Bay Regional Water Treatment Plant Replacement of Media in Filter #7

Bid Date: November 15, 2012
The apparent low bidder is Carbon Activated Corp. from Compton.
Their bid amount was $220,000.00
#2 - Prominent Systems, Inc. - $252,250.00
Calgon Carbon Corp. - No Bid
Only two bids were submitted.

North Bay Regional Water Treatment Plant Valve Replacement in Filter #7

Bid Date: November 15, 2012
The apparent low bidder is TNT Industrial Contractors, Inc. from Sacramento.
Their bid amount was $43,929.00
#2 - ACI Constructors - $52,463.00
#3 - Lister Construction, Inc. - $69,777
Only three bids were submitted.

City Council Chambers A/V Renovation Project

Bid Date: November 13, 2012
The apparent low bidder is Ken's Pro Sound from Fairfield.
Their bid amount was $75,800.00
Only one bid was submitted.

2012 ADA Transition Plan
Civic Center, Laurel Creek Park, Allan Witt Park, Hillview Park

Bid Date: August 23, 2012
The apparent low bidder is Abide Builders, Inc. from Vacaville.
Their bid amount was $99,170.00
#2 - Lister Construction - $100,900.00
#3 - B & M Builders, Inc. - $101,171.50
Only three bids were submitted

North Texas Street Water Line Replacement and Overlay

Bid Date: August 21, 2012
The apparent low bidder is Civil Engineering Construction, Inc. from Loomis.
Their bid amount was $1,726,358.25
#2 - Suulutaaq, Inc. - $1,730,063.00
#3 - McGuire and Hester - $1,925,173.00
DQ - Bay Pacific Pipelines Inc. - $1,527,937.60

Waterman Water Treatment Plant Chemical Storage Tank Coating Project

Bid Date: July 31, 2012
The apparent low bidder is JPA Designs from Citrus Heights.
Their bid amount was $32,700.00
#2 - Redwood Painting Company, Inc. - $36,610.00
#3 - Mason Painting, Inc. - $39,079.00

East West Water Transmission Pipeline Segment 5D

Bid Date: June 19, 2012
The apparent low bidder is Ghilotti Construction Co. from Santa Rosa.
Their bid amount was $2,513,916.80
#2 - Ranger Pipelines - $2,774,559.00
#3 - Mountain Cascade - $2,796,262.00

Waterman Water Treatment Plant Lagoon 2 Underdrain Repair Project

Bid Date: May 17, 2012
The apparent low bidder is MCI Engineering from Stockton.
Their bid amount was $213,059.00
#2 - R.J. Gordon Construction, Inc. - $255,399.25
#3 - Engelke Construction - $238,509.25
***Ashlin Pacific Construction granted relief of bid - $148,996.00

Landscape Maintenance for Gary Falati, Lee Bell, Dover Neighborhood Parks and
the Fairfield Transportation Center

Bid Date: May 15, 2012
The apparent low bidder is Dominguez Landscape.
Their bid amount was $98,924.94
#2 - New Image Landscape Co. - $127,800.00
#3 - TruGreen LandCare - $183,762.00

City Parks Lighting Project - Phase 1

Bid Date: March 20, 2012
The apparent low bidder is Lister Construction from Vacaville.
Their bid amount was $777,674.00
#2 - Vanden Bos Electric, Inc. - $948,072.20
DQ - Cabar Electric Inc
DQ - McKuin Pipeline Inc

Large Trash Capture Device Installation Project

Bid Date: March 6, 2012
The apparent low bidder is Associated Constructors, Inc. from Fairfield.
Their bid amount was $53,000
#2 - Pleasanton Engineering - $56,000
#3 - Ashlin Pacific Construction - $57,872

Landscape Maintenance for Cordelia Community Park Phase 1 and 2

Bid Date: November 14, 2011
The apparent low bidder is Dominguez Landscape Services, Inc. from Sacramento.
Their bid amount was $104,016.00
#2 - Coast Landscape Management - $153,648.00
#3 - New Image Landscape Company - $170,400.00

Landscape Maintenance for Manuel Campos Parkway and North Texas/I-80 Interchange

Bid Date: November 14, 2011
The apparent low bidder is New Image Landscape Company from Fremont.
Their bid amount was $62,400.00
#2 - Dominguez Landscape - $70,623.12
#3 - Coast Landscape Management - $78,720.00

Landscape Maintenance for Cordelia Parks, Trails, Roadsides and Red Top Road

Bid Date: November 8, 2011
The apparent low bidder is New Image Landscape Company from Fremont.
Their bid amount was $188,640.00
#2 - TruGreen LandCare - $190,488.00
#3 - Dominguez Landscape - $214,008.00

Landscape Maintenance for District No. 5 Smith Ranch (Rancho Solano)

Bid Date: November 8, 2011
The apparent low bidder is TruGreen LandCare from Fairfield.
Their bid amount was $469,920.00
#2 - Dominguez Landscape - $566,400.00
#3 - Coast Landscape Management - $566,400.00
Non-responsive - New Image Landscape Company - $229,080.00

Landscape Maintenance for District No. 14 Woodlake/Paradise Crest

Bid Date: November 8, 2011
The apparent low bidder is New Image Landscape Company from Fremont.
Their bid amount was $71,760.00
#2 - TruGreen LandCare - $109,992.00
#3 - Dominguez Landscape - $117,120.00

Landscape Maintenance for District No. 17 Chadbourne-Beck-Cordelia

Bid Date: November 8, 2011
The apparent low bidder is New Image Landscape Company from Fremont.
Their bid amount was $84,840.00
#2 - Dominguez Landscape - $149,280.00
#3 - TruGreen LandCare - $150,000.00

Landscape Maintenance for District No. 19 Corporate Commons

Bid Date: November 8, 2011
The apparent low bidder is New Image Landscape Company from Fremont.
Their bid amount was $73,200.00
#2 - Dominguez Landscape - $88,488.00
#3 - TruGreen LandCare - $120,000.00

Waterman Water Treatment Plant Valve Replacement

Bid Date: November 8, 2011
The apparent low bidder is Associated Constructors, Inc. from Fairfield.
Their bid amount was $83,899.00
#2 - GSE Construction Co., Inc. - $85,800.00
#3 - J R Filanc Construction - $91,000.00

North Bay Regional Water Treatment Plant Concrete Repair and Resurfacing of Filter #1

Bid Date: October 20, 2011
The apparent low bidder is Redwood Painting Company, Inc. from Pittsburg, CA.
Their bid amount was $313,320.00
#2 - F. D. Thomas Inc. - $344,350.00
Only two bids were submitted

North Bay Regional Water Treatment Plant Replacement of Media in Filter #1

Bid Date: October 20, 2011
The apparent low bidder is Carbon Activated Corporation from Compton.
Their bid amount was $241,783.00
#2 - Prominent Systems, Inc. - $250,969.00
#3 - Cowan & Thompson Construction, Inc. - $266,178.00

Rolling Hills Play Equipment Replacement Project

Bid Date: October 4, 2011
The apparent low bidder is Abide Builders, Inc. from Vacaville.
Their bid amount was $48,770.00
#2 - Shawn T. Gardner Builders, Inc. - $49,900.00
#3 - Blossom Valley Construction, Inc. - $50,912.00
Non-responsible (Due to a lack of current factory certification):
Community Playgrounds - $33,977.00
Playscapes Construction, Inc. - $45,000.00

NorthBay Hospital Water Main Replacement Project

Bid Date: September 27, 2011
The apparent low bidder is AshLin Pacific Construction, Inc. from Petaluma.
Their bid amount was $43,875.00
#2 - C.E. Cox Engineering - $53,960.00
#3 - D & D Pipelines Inc. - $58,320.00
Non-responsive - Central Pacific Construction - $43,240.00

East West Water Transmission Pipeline Segment 2, 36 inch

Bid Date: September 6, 2011
The apparent low bidder is Preston Pipelines from Milpitas.
Their bid amount was $2,498,033.00
#2 - Sierra Mountain Construction - $2,771,525.00
#3 - C.R. Fedrick Inc. - $2,889,984.50

Waterman Water Treatment Plant Lagoon 1 and 3 Stockpiling Project

Bid Date: August 31, 2011
The apparent low bidder is MCI Engineering from Stockton.
Their base bid amount was $132,207.40
#2 - Lister Construction Inc. - $134,478.50
#3 - Benchmark Civil Construction - $143,668.00

Police Firing Range Exterior Coating Project

Bid Date: August 4, 2011
The apparent low bidder is B.A. Painting from West Sacramento.
Their bid amount was $34,600
#2 - Legend Construction and Painting - $38,000
#3 - Bella Painting - $39,800

Rancho Solano Subdivision Water Lateral Anode Installation Project

Bid Date: July 18, 2011
The apparent low bidder is Standard Contracting Services from Reno, NV.
Their base bid amount was $86,358.04
#2 - Pacific Underground Services - $110,240.00
#3 - Arrow Construction - $116,806.50

Linear Trail Alternate Route: Nightingale Drive
Federal Aid Project No: CML-5132(038)

Bid Date: July 12, 2011
The apparent low bidder is Ghilotti Construction Co. from Santa Rosa.
Their bid amount was $220,430.00
#2 - G.D. Nielson Construction Inc. - $237, 171.00
Only two bids were submitted

Water and Sewer Main Replacement Program: Woolner Avenue

Bid Date: June 28, 2011
The apparent low bidder is Legg, Inc. from Livermore.
Their bid amount was $517,443.78
#2 - Lister Construction - $517,865.00
#3 - Preston Pipelines - $560,400.00

East Tabor Avenue At-Grade Crossing Improvement Project

Bid Date: June 21, 2011
The apparent low bidder is Ghilotti Bros., Inc. from San Rafael.
Their bid amount was $69,942.00
Only one bid was submitted

Downtown Alleyway and Parking Lot Improvement Project; Alleyway Fire Main

Bid Date: June 13, 2011
The apparent low bidder is MCI Engineering, Inc. from Stockton.
Their bid amount was $128,500.00
#2 - Benchmark Civil Construction, Inc. - $132,540.00
#3 - C.E. Cox Engineering - $133,700.00

Removal and Replacement of Sedimentation Basin Equipment - NBR WTP

Bid Date: April 21, 2011
The apparent low bidder is GSE Construction Co., Inc. from Livermore.
Their bid amount was $598,740.00
#2 - TNT Industrial Contractors, Inc. - $658,911.00
Only two bids were submitted

East-West Water Transmission Pipeline Segments 5A & 6B

Bid Date: April 20, 2011
Engineer's Estimate: $1,896,760.00
The apparent low bidder is Martin General Engineering from Rancho Cordova.
Their total bid was $1,534,204.00.
#2 - Mountain Cascade - $1,859,339
#3 - Preston Pipelines - $1,952,588

Prefabricated Metal Structure Demolition & Removal at 4921 Vanden Road Project

Bid Date: April 7, 2011
Project Budget: $109,000.00
The apparent low bidder is Pantano Demolition from Manteca.
Their bid amount was ($101.00)
#2 - Double B. Demolition, Inc. - $0.00
#3 - Yelton Company - $6,750.00

Cordelia Community Park Project - Phase 2

Bid Date: March 29, 2011
Project Budget: $3,685,940.00
The apparent low bidder is Goodland Landscape Construction from Tracy, CA
Their base bid amount was $3,036,750.65
#2 - Ghilotti Bros., Inc. - $3,576,509.07
#3 - Hemington Landscape Services - $3,801,001.00

Underground Storage Tank Demolition & Removal at 3350 N. Texas Street
(former Chevron Station)

Bid Date: March 29, 2011
Project Budget: $128,000
The apparent low bidder is A+ Environmental Solutions, LLC from Santa Cruz
Their bid amount was $82,865.33
#2 - GEMS Environmental Services - $102,516.69
#3 - Professional Asbestos and Lead Services, Inc. - $164,878.25

Viking Lane / Markley Lane Bypass Project

Bid Date: March 17, 2011
Project Budget: $1,060,000
The apparent low bidder is Ghilotti Construction Co. from Santa Rosa
Their bid amount was $889,571.70
#2 - MCI Engineering - $909,327
#3 - Bay Cities Paving & Grading, Inc. - $918,004.64

Allan Witt Aquatics Complex Dehumidification Pipe Replacement Project

Bid Date: March 15, 2011
Project Budget: $120,000
The apparent low bidder is Associated Constructors, Inc. Fairfield, CA
Their bid was $93,000
#2 - Vaca Valley Excavating - $93,880
#3 - G.D. Nielson Construction - $104,878
***Benchmark Civil Construction ($66,495 bid amount) asked to be released from their bid

Neitzel Road Pavement Rehabilitation Project

Bid Date: February 14, 2011
Project Budget: $800,000
The apparent low bidder is Ghilotti Bros., Inc. from San Rafael, CA
Their bid was $618,577.20
#2 - Vintage Paving Co. - $629,716.19
#3 - Teichert Construction - $632,284

Street & Pedestrian Lighting Retrofit Project

Bid Date: February 10, 2011
Project Budget: $2,265,000
The apparent low bidder is W. Bradley Electric, Inc. from Novato, CA
Their base bid was $2,231,904
#2 - Republic ITS, Inc. - $2,255,755
#3 - Fluoresco Lighting & Signs - $2,270,920.04

2011 Rubberized Cape Seal Project

Bid Date: February 1, 2011
Project Budget: $1,433,530
The apparent low bidder is International Surfacing System from Sacramento, CA
Their base bid ($1,092, 187.10) + add alt ($127,610) = $1,219, 797.10
# 2 - Intermountain - $1,525,324
Only 2 bids were submitted.

Martin Hill Reservoir Rehabilitation Project

Bid Date: December 9, 2010
Project Budget: $450,000
The apparent low bidder is Paso Robles Tank, Inc. from Hemet, CA.
Their bid amount was $439,250
#2 - Spiess Construction Co., Inc. - $441,200
#3 - Pacific Infrastructure Corp. - $459,000

Various Public Facilities Lighting & Landscape Maintenance Districts

Bid Date: October 26, 2010
Project Budget: $120,000/2 years
The apparent low bidder is TruGreen LandCare from Fairfield.
Their bid amount was $79,464.
#2 - New Image Landscape Co. - $82,800
#3 - Dominguez Landscape - $106,080

North Bay Regional WTP Chemical Piping Replacement Project

Bid Date: October 21, 2010
Project Budget: $65,000
The apparent low bidder is Associated Constructors, Inc. from Fairfield.
Their bid amount was $64,185.
#2 - Telstar - $67,460
#3 - GSE Construction Co., Inc. - $76,090

North Bay Regional WTP Concrete Repair & Resurfacing in Filter #4

Bid Date: October 21, 2010
Project Budget: $390,000
The apparent low bidder is Redwood Painting Co., Inc. from Pittsburg.
Their bid amount was $301,275.
#2 - F.D. Thomas, Inc. - $314,984.
Only 2 bids submitted. 

North Bay Regional WTP Replacement of Media in Filter #4

Bid Date: October 21, 2010
Project Budget: $265,000
The apparent low bidder is Carbon Activated Corporation from Compton.
Their bid amount was $230,498.

North Bay Regional WTP Valve Replacement for Filter #4

Bid Date: October 21, 2010
Project Budget: $80,000
The apparent low bidder is Associated Constructors, Inc. from Fairfield.
Their bid amount was $44,250.
#2 - ERS Industrial Services - $47,731.12
#3 - GSE Construction Co., Inc. - $47,917

North Cordelia, Southbrook & Creekside Lighting & Landscape Maintenance District

Bid Date: October 7, 2010
Project Budget: $832,000/2 years
The apparent low bidder is TruGreen LandCare from Fairfield.
Their bid amount was $590,016.
#2 - New Landscape - $710,160
#3 - Coast Landscape Magmata - $722,160

Air Base Parkway Area 2 & Linear Bike Trail Lighting & Landscape Maintenance District

Bid Date: October 7, 2010
Project Budget: $234,000/2 years
The apparent low bidder is TruGreen LandCare from Fairfield.
Their bid amount was $128,568.
#2 - New Image Landscape - $201,360
#3 - Dominguez Landscape - $219, 768

Downtown Lighting & Landscape Maintenance District

Bid Date: October 5, 2010
Project Budget: $69,000/ 2 years
The apparent low bidder is New Image Landscape Co from Fremont.
Their bid amount was $34,800.
#2 - Coast Landscape Mgmt - $64,200
#3 - TruGreen LandCare - $82,008

Gateway Lighting & Landscape Maintenance Districts

Bid Date: October 5, 2010
Project Budget: $130,000/2 years
The apparent low bidder is New Image Landscape Co from Fremont.
Their bid amount was $96,800.
#2 - TruGreen LandCare - $108,768
#3 - Coast Landscape Mgmt - $115,128

Rolling Hills-Kolob-Waterman Highlands Lighting & Landscape Maintenance District

Bid Date: September 28, 2010
Project Budget: $380,000/2 years
The apparent low bidder is TruGreen LandCare from Fairfield.
Their bid amount was $305,136.
#2 - Dominguez Landscape - $334,353.60
#3 - New Image Landscape Co. - $360,000

Paradise Valley and Peppertree Lighting & Landscape Maintenance District

Bid Date: September 28, 2010
Project Budget: $240,000/2 years
The apparent low bidder is Dominguez Landscape from Sacramento.
Their bid amount was $201,264.
#2 - TruGreen LandCare - $214,056
#3 - New Image Landscape Co. - $218,400

Rancho Solano Zone 4 Reservoir Recoating & Rehabilitation

Bid Date: September 21, 2010
Project Budget: $836,000
The apparent low bidder is Crosno Construction Co., Inc. from Arroyo Grande.
Their bid total amount was $699,500.
#2 - Spiess Construction Co., Inc. - $718,780
#3 - Olympus & Associates - $751,956

Tabor Neighborhood Park Renovation

Bid Date: August 31, 2010
Project Budget: $408, 010
The apparent low bidder based on the base amount is Parker Landscape Development, Inc. from Sacramento. Their base bid amount was $386,241.54.
#2 - Dominguez Landscape - $435,082.94
#3 - Jensen Corporation - $445,888

Fairfield PD Communication Center & Electrical Work

Bid Date: August 31, 2010
Project Budget: $1,400,000
The apparent low bidder is SW Allen Construction, Inc. from Sacramento.
Their bid total amount was $1,390,748.
#2 - Albay Construction Co. - $1,491,000
#3 - Diede Construction, Inc. - $1,531,526

Red Top Road Park and Ride Project

Bid Date: August 30, 2010
Project Budget: $1,700,000
The apparent low bidder is Ghilotti Bros. from San Rafael. Their total bid amount was $1,399,176.50.
SUBCONTRACTORS:
    Electrical        Mike Brown Electric, Cotati, CA
    Stripping        Centerline Stripping, Elk Grove, CA
    Landscape      Takehara Landscape, Sacramento, CA
    Fence            Wess Day Gate Systems, Stockton, CA
    Building          RL Zeigenbein Construction, Alamo, CA
#2 - Ghilotti Construction - $1,421,952.90
#3 - Parker Landscape Development, Inc. - $1,424,955.62

2010 Crack Seal Project

Bid Date: July 15, 2010
Project Budget: $170,000
The apparent low bidder is Bond Blacktop, Inc from Union City. Their total bid amount was $151,677.
#2 - J.A. Gonsalves & Son - $242,120
#3 - Valley Slurry Seal Co. - $440,980

30-Inch Water Transmission Pipeline Segment 4

Bid Date: July 7, 2010
Project Budget: $2,000,000
The apparent low bidder is J & M, Inc. from Livermore, CA. Their total bid amount was $1,959,230.
#2 - Associated Constructors, Inc. - $1,973,513
#3 - Lister Construction, Inc. - $2,079, 628.40

Rancho Solano Parkway Edge Drain Installation

Bid Date: June 29, 2010
Project Budget: $135,000.00
The apparent low bidder is Norwood Construction out of Byron, CA. Their total bid amount was $134,565
#2 - Lister Construction - $164,887
#3 - Vintage Paving Co., Inc. - $168,500

Fairfield Transportation Center Renovations Project

Bid Date: June 3, 2010
Project Budget: $850,000
The apparent low bidder is Sequoia Pacific Builders, Inc. Their total bid amount was $764,000.00
#2 - Hometown Construction, Inc. - $812,623.00
#3 - Murray Building, Inc. - $820,000.00
FTC Bid Results

Schedule "A" Water Transmission Pipeline 30-inch Segment 1 and Schedule "B" Suisun Valley Road Pavement Rehabilitation

Bid Date: May 19, 2010
Project Budget: $2,000,000
The apparent low bidder is Martin General Engineering, Inc.
Their total bid amount was $1,594,901.60
#2 - Argonaut Constructors - $1,658,857.10
#3 - J & M, Inc. - $1,677,376.00
A+B Bid Results

Walters Road & Air Base Parkway Pavement Rehabilitation Project

Bid Date: April 6, 2010
Project Budget: $400,000
The apparent low bidder is North Bay Construction, Petaluma, CA
Their bid amount was $300,740.65
#2 - Ghilotti Brothers Construction Inc. - $306,666
#3 - Teichert Construction - $318,110.15
Walters Road Preliminary Bid Results
Walters Road & ABP Top 3 Subs

Suisun Valley Road Pavement Project

Bid Date: March 22, 2010
Project Budget: $557,000
Suisun Valley Rd Preliminary Results 
Suisun Valley Rd Preliminary Top 3 w Subcontractors

Auto Mall Parkway Reconstruction and Widening Project

Bid Date: March 16, 2010
Project Budget: $2,000,000
The apparent low bidder is North Bay Construction, Petaluma, CA
Their bid amount was $1,558,906
#2 - Ghilotti Brothers Construction, Inc. - $1,561,307
#3 - Ghilotti Construction Company - $1,574,378.50
Top 3 bidders with Subs

Landscape Maintenance for Various Neighborhood Parks & Roadsides

Bid Date: February 25, 2010
Project Budget: $680,000
The apparent low bidder is Dominguez Landscape, Sacramento, CA
Their bid amount was $218,055.84
#2 - Huppe Landscape - $371,855.95
#3 - TruGreen LandCare - $425,544

5th & W. Texas Street Pedestrian Improvements

Bid Date: February 24, 2010
Project Budget: $86,000
The apparent low bidder is Emard Engineering, Loomis, CA
Their bid amount was $99,970
#2 - Nor-Cal Concrete, Inc. - $103,925
#3 - Fieldstone Construction, Co. - $117,090

Various Potable Water Reservoir Cleaning & Inspection

Bid Date: February 23, 2010
Project Budget: $50,000
The apparent low bidder is Nisqually Aquatic Technologies, Lacey, WA
Their bid amount was $69,303.97
#2 - Liquivision Technology - $92,450
#3 - DRS Marine, Inc. - $287,500