Markeley Lane Reconnection Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
Subscribe to this page to receive e-mail and text alerts when new information is posted.

Project Overview

The City of Fairfield is moving forward with the Markeley Lane Reconnection Project, a critical improvement to enhance mobility, safety, and connectivity for the community. The Project proposes construction of a 0.20-mile, two-lane residential collector extending from Peabody Road to Viking Lane. The project will provide new bicycle and pedestrian facilities, additional egress and ingress access, and improve local and school traffic circulation. At this time, funding is available only for preliminary engineering.

Recent Updates
Past Updates
Project Overview

Project Features

The project is currently in the planning and design phase. Key design elements under consideration include:

  • Multi-Use Path (Preferred Design): A separated pathway along Markeley Lane providing safe, all-ages access for people walking and biking.
  • Roundabout: A planned intersection improvement to enhance safety and traffic flow.
  • Gateway Concepts: Visual enhancements that reflect Fairfield’s community identity at the project entry points.
  • Drainage Improvements: Updated systems to meet current stormwater and development requirements.
  • Right-of-Way Coordination: The proposed road alignment to connect Markeley Lane from Viking Lane to Peabody Road is within private property.  Land acquisition and easement are necessary for construction. 

The project also integrates with the Travis Safe Routes to School (SR2S) and Transit Trail Project connection. The proposed trail is currently being design from Travis Air Force Base at Air Base Parkway, through Travis Unified School District along De Ronde Drive and Markeley Lane, and connecting to Hannigan Train Station South Portalcreating a continuous corridor for students, residents, service members and commuters.

Environmental Review

The project team is preparing an Environmental Impact Report (EIR) Addendum. Additional studies, such as aquatic resource delineation and drainage updates, are in progress to ensure the project meets all environmental permitting requirements.

Public Outreach

Public outreach for the Markeley Lane Reconnection Project is focused on keeping residents and stakeholders informed as design progresses. Outreach efforts include:

  • City-hosted town hall meetings and stakeholder briefings.
  • Informational updates will be provided through the City’s website and other communication channels.
  • Coordination with the school district and community groups to ensure local priorities are addressed.

At this stage, outreach is primarily informative, ensuring community members are aware of project milestones and opportunities for future input.

 

Markeley Lane - Informational Webinar

Recording from August 13, 2025

Embedded Video

 

Project Schedule

The project schedule is estimated at 24–36 months from planning through construction. Current activities include design refinements, environmental review, and right-of-way coordination. Currently, construction is not funded. The city is actively pursuing grant opportunities to support future phases of the project. Staff and the design consultant will continually evaluate and pursue grant programs that align with the project’s scope, schedule, and funding needs. Construction timelines will be determined as the design advances and funding becomes available.

Stay Informed

The City will continue to provide updates on this page as the project moves forward. Check back regularly for updates on design milestones, environmental reviews, and construction timelines.

For more information, please contact:
City of Fairfield – Public Works Department